Bumble Bee Hollow Road Bank Stabilization & Culvert Replacement
Upper Allen Township
Upper Allen Township is seeking bank stabilization and culvert replacement services for Bumble Bee Hollow Road improvements
Reference No.
RFP-2025-3128
Category
Infrastructure/Construction
Due Date
March 13th, 2026
Description
Replacing an existing concrete pipe with an HDPE pipe and bank stabilization, including the installation of retaining walls and two new headwalls. Work includes clearing and grubbing; 1 LS site excavation; 1 LS soil erosion and sedimentatio control; 126 Tons of R-6 rip rap; 1 LS finish grading and seeding; 130 SY of 1.5" depth milling; 75 LF of type 31-S guide rail (with 7' long posts); 25 LF of curved W-beam guiderail at intersection; pavement markings. See attached files.
This solicitation has some or all Local funding, additional requirements may apply. This project has a "prevailing wage" requirement. Question deadline 03/06/26 by 5:00 PM.
Key Requirements
RFP Submission Requirements for Upper Allen Bank Stabilization
Contact Information
What you’ll get when you unlock
All the details after a short form. No spam
- Latest RFP PDF
- Buyer contact sheet
- Submission checklist
- Any addenda links