RFPs
Upper Allen Township
Bumble Bee Hollow Road Bank Stabilization & Culvert Replacement

Bumble Bee Hollow Road Bank Stabilization & Culvert Replacement

Upper Allen Township

Upper Allen Township is seeking bank stabilization and culvert replacement services for Bumble Bee Hollow Road improvements

Reference No.
RFP-2025-3128
Category
Infrastructure/Construction
Due Date
March 13th, 2026

Description

Replacing an existing concrete pipe with an HDPE pipe and bank stabilization, including the installation of retaining walls and two new headwalls. Work includes clearing and grubbing; 1 LS site excavation; 1 LS soil erosion and sedimentatio control; 126 Tons of R-6 rip rap; 1 LS finish grading and seeding; 130 SY of 1.5" depth milling; 75 LF of type 31-S guide rail (with 7' long posts); 25 LF of curved W-beam guiderail at intersection; pavement markings. See attached files. This solicitation has some or all Local funding, additional requirements may apply. This project has a "prevailing wage" requirement. Question deadline 03/06/26 by 5:00 PM.

Key Requirements

RFP Submission Requirements for Upper Allen Bank Stabilization

Contact Information

What you’ll get when you unlock

All the details after a short form. No spam

  • Latest RFP PDF
  • Buyer contact sheet
  • Submission checklist
  • Any addenda links

Fill in your details we'll send you your RFP

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.