2026 Local Rehabilitation
Battle Creek, City of - Purchasing
Battle Creek is seeking local rehabilitation work for street and airport improvements.
Reference No.
RFP-2025-3128
Category
Infrastructure/Construction
Due Date
March 26th, 2026
Description
Work include 1,270' curb and gutter, rem; 160 SY pavt, rem, modified; 850 SY pavt, rem, modified, wwtp; 960 SY sidewalk, rem, modified; 38 EA dr structure cover, adj, case 1, modified; 73,040 SY cold milling hma surface; 5,200 SY cold milling hma surface (airport); 6,790 TN hma, 4el; 160 SY conc base cse, nonreinf, 6"; 830' concrete curb, match existing, modified; 1,465' pavt mrkg, ovly cold plastic, 6", crosswalk; 625' pavt mrkg, ovly cold plastic, 12", crosswalk; 240' pavt mrkg, ovly cold plastic, 24", stop bar; 14,030' pavt mrkg, sprayable thermopl, 4", white; 35,400' pavt mrkg, sprayable thermopl, 4", yellow.
This solicitation has some or all Local funding, additional requirements may apply. POC Bailey Heykoop, email 269-966-3343 Ex:1861; Chris Huff, Ph 269-966-1646, email clhuff@battlecreekmi.gov. Various Location Vanburen St. Limit St. to Washington Ave; Champion St. Kendall St. to West St.; Calhoun St. West St. to North Ave; E Roosevelt Ave. Capital Ave. NE to Wagner Dr; Wagner Dr. E Roosevelt Ave. to Emmett S; S Minges Rd. Lynwood Dr. to Knapp Dr; Foster Ave. Lakeview Ave. to Columbia Ave.; Beckman Ave. Lakeview Ave. to Columbia Ave; Watkins Ln. Entire Length; Wastewater Treatment Plant - 2000 W River Rd. Around residuals storage facility; Battle Creek Executive Airport - 15551 South Airport Rd. Around WMU campus
Key Requirements
RFP Submission Requirements for Battle Creek Local Rehab
Contact Information
What you’ll get when you unlock
All the details after a short form. No spam
Unlock full RFP details
- Latest RFP PDF
- Buyer contact sheet
- Submission checklist
- Any addenda links

