2026 Utility Trench Restoration
Lewiston, City of
Lewiston City is seeking utility trench restoration for road repair.
Reference No.
RFP-2025-3128
Category
Infrastructure/Construction
Due Date
April 7th, 2026
Description
Utility trench restoration. Scope of work includes Remove existing material, add gravel as necessary, compact road base material, cut
pavement to provide straight edge, tack, place 3.5" of pavement (2" of 19.0, 1.5" of 9.5"). Compact HMA with roller (3-5 ton minimum). Remove existing material, add gravel as necessary, compact road base material, cut pavement to provide straight edge, tack, place 6" of pavement in 3 lifts (2.5" of 19.0, 2" of 19.0 or 12.5, & 1.5" of 9.5"). Compact HMA with roller (3-5 ton minimum). See attached file.
Questions and Requests for Information shall be submitted to Justin Bisson (jbisson@lewistonmaine.gov) on or before noon, April 1, 2026.
This solicitation has some or all Local funding, additional requirements may apply.
Key Requirements
RFP Submission Requirements for Lewiston Utility Trench Restoration
Contact Information
What you’ll get when you unlock
All the details after a short form. No spam
Unlock full RFP details
- Latest RFP PDF
- Buyer contact sheet
- Submission checklist
- Any addenda links

