2026 Utility Trench Restoration

Lewiston, City of

Lewiston City is seeking utility trench restoration for road repair.

Reference No.
RFP-2025-3128
Category
Infrastructure/Construction
Due Date
April 7th, 2026

Description

Utility trench restoration. Scope of work includes Remove existing material, add gravel as necessary, compact road base material, cut pavement to provide straight edge, tack, place 3.5" of pavement (2" of 19.0, 1.5" of 9.5"). Compact HMA with roller (3-5 ton minimum). Remove existing material, add gravel as necessary, compact road base material, cut pavement to provide straight edge, tack, place 6" of pavement in 3 lifts (2.5" of 19.0, 2" of 19.0 or 12.5, & 1.5" of 9.5"). Compact HMA with roller (3-5 ton minimum). See attached file. Questions and Requests for Information shall be submitted to Justin Bisson (jbisson@lewistonmaine.gov) on or before noon, April 1, 2026. This solicitation has some or all Local funding, additional requirements may apply.

Key Requirements

RFP Submission Requirements for Lewiston Utility Trench Restoration

Contact Information

What you’ll get when you unlock

All the details after a short form. No spam

Unlock full RFP details
  • Latest RFP PDF
  • Buyer contact sheet
  • Submission checklist
  • Any addenda links

Fill in your details we'll send you your RFP

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.