RFPs
Facilities/Maintenance
Automatic Transfer Switch (ATS) Replacement at the Elm Point Water Treatment Plant

Automatic Transfer Switch (ATS) Replacement at the Elm Point Water Treatment Plant

St. Charles City - Purchasing Dept.

St. Charles City - Purchasing Dept. is seeking proposals for automatic transfer switch (ats) replacement at the elm point water treatment plant.

Reference No.
RFP-2025-3128
Category
Facilities/Maintenance
Due Date
April 1st, 2026

Description

Automatic transfer switch (ATS) replacement at water treatment plant. The Contractor is responsible for procuring and installing two (2) automatic transfer switches. Contractor shall verify that the replacement switches will fit within the existing space. The existing equipment pad shall be utilized for placement of the new switches. The existing ATS enclosures are 32-inches wide x 38" deep x 91.5" high each, both installed on a concrete equipment pad measuring 81" wide x 39" deep. see attached file. Deadline for clarifying questions March 24, 2026 3:00 PM. This project has a "prevailing wage" requirement. This solicitation has some or all Local funding, additional requirements may apply.

Key Requirements

RFP Submission Requirements for St. Charles City ATS Replacement

Contact Information

What you’ll get when you unlock

All the details after a short form. No spam

Unlock full RFP details
  • Latest RFP PDF
  • Buyer contact sheet
  • Submission checklist
  • Any addenda links

Fill in your details we'll send you your RFP

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.