Bay Village Development Walkway Replacement Project Phase 4
New Bedford Housing Authority
New Bedford Housing Authority is seeking walkway replacement services for accessibility improvements and erosion control.
Reference No.
RFP-2025-3128
Category
Infrastructure/Construction
Due Date
March 19th, 2026
Description
Installation of erosion control measures and tree protection; saw cutting of asphalt and concrete; removal and disposal of existing bituminous concrete and concrete walkways/areas; disposal of excavated material; remove and reset curbing; furnish and install new precast concrete & granite curb; installation of root barrier; tree root pruning, preparing the walkway subgrade; concrete and subgrade material testing; protection of work; loam and seed areas; and construction of concrete walkways.
A pre-bid conference shall be held on Wednesday March 11, 2026, at 9:00 AM. The meeting will begin at 99 Griffin Circle Street, New Bedford, MA 02740. Q&A deadline March 16, 2026, at 2:00 PM.
This solicitation has some or all State funding, additional requirements may apply. This project has a "prevailing wage" requirement.
Key Requirements
RFP Submission Requirements for New Bedford Housing Bay Village Walkway
Contact Information
What you’ll get when you unlock
All the details after a short form. No spam
Unlock full RFP details
- Latest RFP PDF
- Buyer contact sheet
- Submission checklist
- Any addenda links

