2026 Trail Rehabilitation Project

Champlin, City of

Champlin is seeking trail rehabilitation services for the 2026 Trail Rehabilitation Project.

Reference No.
RFP-2025-3128
Category
Infrastructure/Construction
Due Date
March 27th, 2026

Description

The project involves extensive site preparation, including 0.75 acres each for clearing and grubbing, followed by 2.98 acres of seeding and substantial erosion control, such as 4,336 LFof sediment control logs and 292 linear feet of silt fence. Earthwork requirements consist of 232 CY of common excavation, 870 cubic yards of muck excavation, and 128 CY of subgrade excavation, supported by 257 CY of common embankment and 360 CY of select granular embankment. Infrastructure and paving tasks include 5,651 SY of full depth reclamation, 5,665 SY of Type SP 9.5 wearing course mixture, and 975 square yards of soil stabilization geogrid. Drainage installation is significant, featuring 1,471 linear feet of 8" perforated PVC pipe drain, 683 LF of 10" perforated PVC, and various RC pipe culverts and aprons, along with the construction of six Design H drainage structures. This solicitation has some or all Local funding, additional requirements may apply.

Key Requirements

RFP Submission Requirements for Champlin Trail Rehabilitation

Contact Information

What you’ll get when you unlock

All the details after a short form. No spam

Unlock full RFP details
  • Latest RFP PDF
  • Buyer contact sheet
  • Submission checklist
  • Any addenda links

Fill in your details we'll send you your RFP

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
----------------- ------------------