2026 2025 Road Maintenance Program
Cherry Hill, Township of
Cherry Hill Township is seeking road maintenance services for the 2025-2026 road maintenance program.
Reference No.
RFP-2025-3128
Category
Infrastructure/Construction
Due Date
April 1st, 2026
Description
Work includes maintenance & protection of traffic, tree stump removal, tree removal 0" to 6" diameter, 5,582 LF 6"x8"x 18" concrete vertical curb, 3,611 SY concrete sidewalk 4" thick, 2,006 SY concrete driveway 6" thick, 1,832 LF monolithic curb & gutter, 20 LF steel plate curb at tree base, 768 SF ADA detectible warning surface ramp, set manhole using new casting, bicylce safe grates, 10 tn hot mix asphalt 9. 5m64 leveling course (separate application), 65,000 SY hma milling, 3" or less, 25 CY excavation, unclassified, 1,236 SY hot mix asphalt pavement repairs (6" dga/4" base, curb trenches, 100 tn hot mix asphalt 19m64 base course 4" thick, 5,850 gal tack coat. See attached file.
This solicitation has some or all Local funding, additional requirements may apply. This project has a "prevailing wage" requirement.
Key Requirements
RFP Submission Requirements for Cherry Hill Road Maintenance
Contact Information
What you’ll get when you unlock
All the details after a short form. No spam
Unlock full RFP details
- Latest RFP PDF
- Buyer contact sheet
- Submission checklist
- Any addenda links

