2026 Burlington Sidewalk Program

Burlington

Burlington is seeking sidewalk removal and replacement services for the 2026 Burlington Sidewalk Program.

Reference No.
RFP-2025-3128
Category
Infrastructure/Construction
Due Date
March 26th, 2026

Description

Sealed Bids, for the City of Burlington (Owner)“2026 Burlington Sidewalk Program"contract, will be received by theCity of Burlington, Wisconsin,untilThursday, March 26, 2026, at 9:00 a.m., CDT.Bids areREQUIREDto beSUBMITTED ELECTRONICALLYthrough www.QuestCDN.com. Bids will be opened and read aloud via a Microsoft Teams conference call at the above time and date, with results posted online shortly thereafter. Instructions to join the Teams conference call are as follows:Join Teams Meeting by Web Browser:Meeting ID: 262 914 783 730 12Passcode: Jo6h8nS3Or call in and join Teams meeting by mobile (audio only)1-414-662-4839Phone Conference ID: 387 178 111#The work includes furnishing of all materials and equipment and performance of the following work, according to the Plans, Specifications and Contract Documents (PS & CD).The Base Bid work for the above contract includes removal and replacement of sidewalk in the respective locations throughout the City of Burlington. Major items of work and approximate quantities for which bids are requested include: 2700 SF Concrete Sidewalk 4-Inch, 250 SF Concrete Sidewalk 6-Inch, 60 LF of concrete curb and gutter, 10 SY Asphalt Patching, and 120 SF of ADA Curb Ramp.The Bidding Documents, consisting of Advertisement for Bids, Instructions to Bidders, General Conditions, Supplementary Conditions, Bid Bond, Agreement, Drawings and Specifications, may be examined atQuestCDN.comby inputting Quest project#10088069on the website’s Project Search page.A Bidders qualification statement form will be issued with the Bid Documents and must be completed and submitted online along with the bid submittal.No Bid will be accepted from any Bidder who has not submitted a Bidders Qualification Statement form.Contractors who have submitted a prequalification statement to the Owner, for this calendar year and for the work specific to this project, shall state this on their Bidders Qualification Statement form. These qualification forms, and prequalification forms, will be reviewed; however, updated proof of qualification may be requested by the Owner prior to acceptance of any Bid. The Owner reserves the right to reject the Bid of any Bidder who has been determined to be unqualified.As a part of their Bids, Bidders shall submit a full and complete list of all their proposed Subcontractors, and the class of work which each will perform. The selected Contractor shall not alter this list without the written consent of the Owner. The PS & CD require that the selected Contractor and Subcontractor(s) furnish a Certificate of Insurance.All Bids shall be accompanied by Bid Security in the form of a Bid Bond, bank money order, or a qualified certified check, payable to the Owner, in the amount equal to five percent of the Bid. This requirement serves to guarantee that, if the Owner accepts the Bid, the selected Contractor will execute and deliver the proper Contract Agreement and Bonds within 15 calendar days after the Notice of Award by the Owner. Failure to return these documents within this prescribed time will result in forfeiture, to the Owner, of the selected Contractor's Bid Security, as liquidated damages. Prospective bidders must be on the plan holders list through QuestCDN for Bids to be accepted. Bidders may not withdraw their Bid within the 90-day period after the date of the bid opening.Complete digital project bidding documents (PS & CD) willonly be availableatwww.questcdn.com.  You may download the digital plan documents for$22.00 (non-refundable)by inputting Quest project#10088069on the website’s Project Search page. Please contact QuestCDN.com at 952-233-1632 orFor security reasons, you must enable JavaScript to view this E-mail address.for assistance in free membership registration, downloading, and working with this digital project information.Bidding documents will be available on or before Thursday, March 12, 2026.The Owner reserves the right to reject any or all bids, waive or not waive any informality in the bids received and to accept any proposal, which they deem most favorable to the interests of the Owner.

Key Requirements

RFP Submission Requirements for Burlington Sidewalk Program

Contact Information

What you’ll get when you unlock

All the details after a short form. No spam

Unlock full RFP details
  • Latest RFP PDF
  • Buyer contact sheet
  • Submission checklist
  • Any addenda links

Fill in your details we'll send you your RFP

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.