2026 Liquid Fuels Road Program
Newtown, Township of
Newtown Township is seeking road program services for infrastructure improvement.
Reference No.
RFP-2025-3128
Category
Infrastructure/Construction
Due Date
March 18th, 2026
Description
Work consists of replacement of concrete curb and sidewalk, including the replacement of depressed concrete driveway aprons as directed by the township; replacement of existing curb ramps with ada compliant curb ramps, including new detectable warning surfaces and concrete check walls where required; replacement of inlet tops, frames and grates; pavement base repairs; asphalt mill and overlay construction; replacement of existing pavement markings, and all restorations required for the work listed. The work also includes mobilization,
maintenance and protection of traffic and erosion and sediment controls, as necessary to perform the work.
This solicitation has some or all Local funding, additional requirements may apply. This project has a "prevailing wage" requirement. Questions Due Date Mar 11th 2026, 5:00 PM EDT. Project locations include the following Eagleton Farm Road, partial length, back loop starting at Millers Road intersection; Union Street, entire length; Jonquil Drive, partial length, Eagle Road to Shamrock Court; Everett Drive, partial length, House 101 to L. Dolington Road; Columbine Circle w/ Goldenrod Court, partial length, 14 Columbine Circle to South Drive; Hidden Valley Lane, entire length. See attached file.
Key Requirements
RFP Submission Requirements for Newtown Twp Liquid Fuels
Contact Information
What you’ll get when you unlock
All the details after a short form. No spam
Unlock full RFP details
- Latest RFP PDF
- Buyer contact sheet
- Submission checklist
- Any addenda links

