RFPs
Thomasville City School Board Of Education
Scott Elementary School Roof Replacement & Recover

Scott Elementary School Roof Replacement & Recover

Thomasville City School Board Of Education

Thomasville City School Board of Education is seeking roof replacement and recover services for school building improvements

Reference No.
RFP-2025-3128
Category
Infrastructure/Construction
Due Date
December 9th, 2025

Description

1. Roof replacement Bldg. 100 (+/- 38,000 sq ft): Two roofs in place. Remove two roof assemblies down to original zonolite lightweight insulating vermiculite fill over metal formdeck. Install new temporary roof, lightweight insulating cellular concrete (LWIC) fill with insulporm rigid insulation board and fleece-back single ply membrane adhered to LWIC. 2. Roof recover Bldgs. 200, 201, 202, 300 & 400 Gym (+/- 16,100 sq ft): One single ply roof assembly in place. Existing roof to remain. Install new single ply assembly consisting of rigid insulation board, cover board and single ply membrane (adhered). Coverboard mechanically attached to existing structural metal deck. 3. Install overflow roof drains and storm drain piping at Bldg. 100

Key Requirements

RFP Submission Requirements for Thomasville Schools Scott Roof

Contact Information

What you’ll get when you unlock

All the details after a short form. No spam

  • Latest RFP PDF
  • Buyer contact sheet
  • Submission checklist
  • Any addenda links

Fill in your details we'll send you your RFP

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.