Scott Elementary School Roof Replacement & Recover
Thomasville City School Board Of Education
Thomasville City School Board of Education is seeking roof replacement and recover services for school building improvements
Reference No.
RFP-2025-3128
Category
Infrastructure/Construction
Due Date
December 9th, 2025
Description
1. Roof replacement Bldg. 100 (+/- 38,000 sq ft): Two roofs in place. Remove two roof assemblies down to original zonolite lightweight insulating vermiculite fill over metal formdeck. Install new temporary roof, lightweight insulating cellular concrete (LWIC) fill with insulporm rigid insulation board and fleece-back single ply membrane adhered to LWIC. 2. Roof recover Bldgs. 200, 201, 202, 300 & 400 Gym (+/- 16,100 sq ft): One single ply roof assembly in place. Existing roof to remain. Install new single ply assembly consisting of rigid insulation board, cover board and single ply membrane (adhered). Coverboard mechanically attached to existing structural metal deck. 3. Install overflow roof drains and storm drain piping at Bldg. 100
Key Requirements
RFP Submission Requirements for Thomasville Schools Scott Roof
Contact Information
What you’ll get when you unlock
All the details after a short form. No spam
- Latest RFP PDF
- Buyer contact sheet
- Submission checklist
- Any addenda links