DAF WTP Pump VFD Replacement
City
City is seeking a dissolved air flotation water treatment plant pump VFD replacement to upgrade their system.
Reference No.
RFP-2025-3128
Category
Facilities/Maintenance
Due Date
October 13th, 2025
Description
1. The project generally consists of the replacement for the Dissolved Air Flotation Water Treatment Plant Pump No. 2 VFD furnishing of all labor, materials, equipment, appurtenances, and incidentals as shown, specified and required for demolition, removal, and disposal work required to properly install the equipment and ensure all instrument and control connections are correctly configured, follow the manufacturer’s installation guide, verify wiring according to the schematic, and perform functioning testing before commissioning the VFD. The project requires all site work, labor, equipment, and materials complete and in place as stated in the RFB, shown on the plans, and specified herein.2. General Contractor shall self-perform a minimum of 51% of this project.3. Liquidation Fee is $1000.00 for each day of delay.4. TxDot Qualifications are NOT Required for this project.The Work will be substantially completed and in-service in 255 calendar days as provided in Paragraph 2.03 of the General Conditions, and completed and ready for final payment in accordance with Paragraph 14.07 of the General Conditions in 285 calendar days. If Additive Alternate #1 is awarded in any combination with the Base Bid, the Work will be substantially completed and in-service in 325 calendar days, and the project will be completed and ready for final payment in 355 calendar days. If a Contractor wants to perform work on Saturdays, Sundays, or City holidays, the Contractor shall seek approval by making a written request to City
Key Requirements
RFP Submission Requirements for City DAF WTP Pump VFD
Contact Information
What you’ll get when you unlock
All the details after a short form. No spam
- Latest RFP PDF
- Buyer contact sheet
- Submission checklist
- Any addenda links