Acquisition and Installation of Electric Vehicle Charging Stations (RFP)
Newnan, City of
Newnan, City of, is seeking EV charging stations and installation for public use at multiple locations.
Reference No.
RFP-2025-3128
Category
Environment/Energy
Due Date
November 11th, 2025
Description
Purchase, delivery, and installation of three (3) electric vehicle (EV) charging stations. Equipment Specifications. • Charging stations must be new, UL-certified, and compliant with SAE J1772 (Level 2), CCS, and/or CHAdeMO standards (for DC fast charging). • Must support Open Charge Point Protocol (OCPP 1.6 or higher) to ensure network. interoperability. • Networking must allow for usage monitoring, reporting, and remote troubleshooting. • Equipment must meet ADA accessibility requirements. Installation Requirements • The contractor is responsible for all site preparation, trenching, conduit installation, electrical upgrades, concrete pads, signage, and striping as required. • All work must comply with the National Electrical Code (NEC), local building codes, and permitting requirements. • The contractor must coordinate with the local utility provider for power connection and upgrades if required. • Contractor must ensure ADA-compliant site layout.
This solicitation has some or all Federal funding, additional requirements may apply. Question writing due by October 29, 2025, 5:00pm EST. Project Locations 1. 92 Farmer Street, Newnan, Georgia 30263 (CJ Smith Park). 2. 1 Joseph Hannah Boulevard, Newnan, Georgia 30263 (House of Pickleball). 3. 473 Greison Trail, Newnan, Georgia 30263 (Newnan Fire Training Facility). This project has a "prevailing wage" requirement.
Key Requirements
RFP Submission Requirements for Newnan EV Charging Stations
Contact Information
What you’ll get when you unlock
All the details after a short form. No spam
- Latest RFP PDF
- Buyer contact sheet
- Submission checklist
- Any addenda links