B-42399-B Bridge Replacement
Indiana Dept. of Transportation
Indiana DOT is seeking bridge replacement services for infrastructure improvement.
Reference No.
RFP-2025-3128
Category
Infrastructure/Construction
Due Date
February 11th, 2026
Description
Work consists of excavation, common, 1359 CY; excavation, waterway, 210 CY; subgrade treatment, Type II, 84 SY; milling, asphalt, 1 1/2-IN, 312 SY; asphalt for tack coat, 2330 SY; guardrail terminal system, w-beam, curved, Type 7, 1EA; guardrail, MGS W-beam, 6ft 3-IN spacing, 231.25 LF; guardrail, w-beam, 6 ft 3-IN spacing, 56.25 LF; riprap, class 1, 688 TN; riprap, class 2, 100 TN; seed mixture, native, 12 lbs; mulched seeding, Type R, 138 SY; sodding, 260 SY; concrete, B, footings, 77.50 CY; waterproofing membrane, Type 2, 1969 SF; construction sign, Type A, 14 EA; barricade, Type III-A, 48 LF; sign post, square, type 1, unreinforced anchor base, 11.50 LF.
Completion Date November 03, 2027,
This solicitation has some or all State funding, additional requirements may apply.
Key Requirements
RFP Submission Requirements for Indiana DOT Bridge Replacement
Contact Information
What you’ll get when you unlock
All the details after a short form. No spam
- Latest RFP PDF
- Buyer contact sheet
- Submission checklist
- Any addenda links