RFB Coastal 29 Fiber Project
Quinault
Quinault is seeking fiber relocation and splicing for fish passage upgrades.
Reference No.
RFP-2025-3128
Category
Infrastructure/Construction
Due Date
December 4th, 2025
Description
Existing fiber utilities to be relocated as a result of five (5) crossings required to be upgraded to fish passage criteria. Qin fiber shall be operational during Phase 1 and Phase 2 of the project. It is anticipated while splicing occurs short term outages will occur. The contractor shall perform splicing and attachments in an efficient manner and outages shall be less than 12 hours during splicing operations Phase 1 consists of locating QIN fiber along Highway 109, installing vaults, splicing fiber, temporary ground lay fiber and connectivity to allow a fully operational system. Phase 2 consists of removal of temporary ground lay conduit and fiber. Connecting fiber to newly placed poles and aerial attachment to achieve a fully functional fiber path. Splicing shall result in no-loss connectivity for both Phase 1 and Phase 2.SEE RELATED DOCUMENT BELOW
Key Requirements
RFP Submission Requirements for Quinault Coastal Fiber
Contact Information
What you’ll get when you unlock
All the details after a short form. No spam
- Latest RFP PDF
- Buyer contact sheet
- Submission checklist
- Any addenda links