Manhole Rehabilitation FY26
CITY OF ROCKY MOUNT
Rocky Mount is seeking manhole rehabilitation services to lessen stormwater infiltration into the sewer system.
Reference No.
RFP-2025-3128
Category
Infrastructure/Construction
Due Date
February 5th, 2026
Description
The City of Rocky Mount and Water Resources Department is seeking responses from qualified licensed utility contractors for continued efforts to maintain the collections system and to lessen the infiltration of stormwater run-off and ground saturation into the sewer collection system. The Contractor shall be licensed and bonded in North Carolina and shall use sufficient workmen and competent supervisors in the execution of this portion of the work to ensure adequate and proper installation throughout. This specification references standards from the American Society for Testing and Materials, such as: ASTM F1216 (Rehabilitation of Existing Pipelines and Conduits by the Inversion and Curing of a Resin-Impregnated Tube), ASTM F1743 (Rehabilitation of Existing Pipelines and Conduits by Pulled-in-Place Installation of Cured-in-Place Thermosetting Resin Pipe (CIPP)), ASTM D5813 (Cured-in-Place Thermosetting Resin Sewer Pipe), ASTM D790 (Test Methods for Flexural Properties of Un-reinforced and Reinforced Plastics and Electrical Insulating Materials), and D2990 (Tensile, Compressive, and Flexural Creep and Creep-Rupture of Plastics) which are made a part hereof by such reference and shall be the latest edition and revision thereof. In case of conflicting requirements between this specification and these referenced documents, this specification will govern
Key Requirements
RFP Submission Requirements for Rocky Mount Manhole Rehab
Contact Information
What you’ll get when you unlock
All the details after a short form. No spam
- Latest RFP PDF
- Buyer contact sheet
- Submission checklist
- Any addenda links