Atlanta Speedway Airport - Hangar Site Construction
Henry County
Henry County is seeking hangar site construction services for Atlanta Speedway Airport expansion.
Reference No.
RFP-2025-3128
Category
Infrastructure/Construction
Due Date
February 12th, 2026
Description
Work consist of 20 CY of concrete gravity retaining wall, 70 SY of stone dumped rip rap, demolition of existing hangar buildings and removal (including foundations, subsurface infrastructure, lead-based paint, and asbestos abatement, 1 EA of adjust existing sanitary manhole to grade, 11 EA of concrete pipe bollards, including concrete, foundations, painted yellow, installed, 400 LF of 4" h sch 40 PVC electrical conduit with stub-ups and pull strings capped, 4,075 SY of dry enhanced swale (incl undercutting, filter media, and sodding), 925 TN of recycled asphaltic concrete, 12.5mm, superpave including bituminous materials and hydrated lime. See attached file.
Q&A deadline is on 01/29/26 by 3:00 PM.
This solicitation has some or all Local funding, additional requirements may apply.
Key Requirements
RFP Submission Requirements for Henry County Airport Hangar
Contact Information
What you’ll get when you unlock
All the details after a short form. No spam
- Latest RFP PDF
- Buyer contact sheet
- Submission checklist
- Any addenda links