053, 20251107053, STPBH-3716(256) - Constructing the Bridge Replacement (Grading, Drainage, Pavement, and Bridge Removal)
Alabama Dept. of Transportation (DOT)
Alabama DOT is seeking a contractor for bridge replacement and rehabilitation for infrastructure improvement.
Reference No.
RFP-2025-3128
Category
Infrastructure/Construction
Due Date
November 7th, 2025
Description
Constructing the bridge replacement (grading, drainage, pavement, and bridge removal) and the bridge rehabilitation. Includes 1 LS of approx. 1 acre of clearing and grubbing; 203 LF of removing guardrail; 308 CY of unclassified excavation; 33 LF of cleaning existing pipe (less than or equal to 48" horizontal opening); 490 LF of 8" DI water main laid; 110 LF of 16" steel encasement pipe, type 4 installation; see attached file.
This solicitation has some or all Federal funding, additional requirements may apply. This project has a "prevailing wage" requirement. Proposals will be issued only to prequalified contractors or their authorized representatives, upon requests that are received before 10 AM., on the day previous to the day of opening of bids.
Key Requirements
RFP Submission Requirements for Alabama DOT Bridge Replacement
Contact Information
What you’ll get when you unlock
All the details after a short form. No spam
- Latest RFP PDF
- Buyer contact sheet
- Submission checklist
- Any addenda links