Calle Frontera Lift Station Soil Stabilization Project
San Clemente, City of
San Clemente is seeking soil stabilization for the Calle Frontera Lift Station project.
Reference No.
RFP-2025-3128
Category
Infrastructure/Construction
Due Date
November 12th, 2025
Description
Work consists of Maintaining lift station operations to the greatest extents possible, clearing and grubbing the perimeter as required for construction access, portland cement concrete (pcc) and asphalt concrete (ac) pavement demolition and disposal within the lift station perimeter walls, protecting existing utilities and lift station improvements not to be removed, remove and salvage antenna pole, excavations and installation of new concrete cast-in-drilled-hole pile foundations, forming and constructing new concrete pile cap, reinstall salvaged antenna pole on new concrete pedestal, construct closure pours between new and existing foundations, repair perimeter wall expansion joints, modifying lift station aboveground plumbing to recenter vertical discharge pipes in existing sleeves, construct new v-gutter, pcc flatwork, and ac paving including removal, salvage, and reinstallation of pipe supports, miscellaneous landscaping, planting, and irrigation maintenance and repairs.
Q&A deadline is on 11/03/25, 4:00 PM.
This solicitation has some or all Local funding, additional requirements may apply.
Key Requirements
RFP Submission Requirements for San Clemente Soil Stabilization
Contact Information
What you’ll get when you unlock
All the details after a short form. No spam
- Latest RFP PDF
- Buyer contact sheet
- Submission checklist
- Any addenda links