RFPs
Bolivia
ITB: TWAS to ATAD Drill

ITB: TWAS to ATAD Drill

Bolivia

Brunswick County is seeking waterline installation via drilling beneath a building for water supply infrastructure.

Reference No.
RFP-2025-3128
Category
Infrastructure/Construction
Due Date
November 18th, 2025

Description

ITB: TWAS to ATAD DrillClick here to view full documentINVITATION TO BIDBrunswick County is soliciting informal bids from qualified contractors for the installation of approximately twenty (20) linear feet of 6-inch PVC C900 waterline via horizontal directional drilling (HDD) or Bore and Jack beneath an existing building wall and into a below-grade dry well at an approximate depth of six (6) feet. The location for this project is 235 Grey Water Road, Supply, NC 28462.The work includes coring through an approximately 12-inch-thick concrete foundation wall and sealing the penetration using a LINK-SEAL® Modular Seal, Pipetite® Wall Boot, or approved equal to prevent water intrusion and maintain structural integrity. The 6-inch PVC C900 may be installed in a ½” thick, minimum 10-inch steel casing pipe with casing spacers and end seals, or alternately, as 6-inch HDPE installed without casing, provided that the wall seal system is appropriately rated and approved by the County. On the exterior side of the wall, the contractor shall connect the new 6-inch line to the existing pipe using a 6” to 6” mechanical sleeve, backfill and compact the trench per County standards to a condition ready for pavement restoration, and restore all disturbed surfaces and pavement to their original or better condition. All materials, installation methods, and testing shall comply with Brunswick County’s Technical Specifications and Standard Details.Any changes to the specifications or Scope of Work contained herein will be made in the form of an Addendum to this Invitation to Bid and will be supplied to all known prospective bidders and posted on the Brunswick County website. Notwithstanding the foregoing, bidders will be responsible for ensuring that they have all addenda. Brunswick County may negotiate and refine final specifications and Scope of Work with the selected bidderSCOPE OF WORKA more detailed Scope of Work includes, but is not necessarily limited to, the following:2.1 Install approximately twenty (20) linear feet of 6-inch PVC C900 waterline.2.2 Installation method: Horizontal Directional Drilling (HDD) or Bore and Jack.Base Bid: Install 6-inch PVC C900 inside a ½” thick, minimum 10-inch steel casing pipe with casing spacers and end seals.Alternate 1: Install 6-inch HDPE pipe without casing, provided that the wall seal system is rated and approved by Brunswick County.2.3 Alignment is beneath an existing building wall into a below-grade dry well at approximately six (6) feet depth.2.4 Core through an existing 12-inch-thick concrete foundation wall.2.5 Seal penetration using LINK-SEAL® Modular Seal, Pipetite® Wall Boot, or approved equal.2.6 Ensure seals prevent water intrusion and maintain structural integrity.2.7 Connect the newly installed 6-inch pipeline to the existing 6-inch pipeline in accordance with the selected installation method (HDD or Bore and Jack). Ensure proper alignment, restraint, and watertight integrity.2.8 Prepare the trench area to be ready for pavement restoration.2.9 Restore all disturbed pavement, surfaces, and site features to original or better condition.SPECIFICATIONSThe contractor shall adhere to all applicable Brunswick County Technical Specifications and Standard Details, located on the Brunswick County website at https://www.brunswickcountync.gov/245/Engineering-Design-Manual. This includes, but is not necessarily limited to the following:? TS 001 Definitions and Terms? TS 002 Existing Underground Utility lines and Structures? TS 009 Erosion and Sediment Control? TS 011 Dewatering? TS 012 Trench Boxes, Sheeting and Shoring? TS 013 Excavating, Grading, Trenching, and Backfilling? TS 014 Boring and Jacking? TS 015 Directional Drilling? TS 017 Asphalt Paving? TS 022 Waste Water Force Mains? TS 025 Landscaping? Brunswick County General Water & Sewer Details - Sheet 2LICENSINGAll contractors are hereby notified that they must have proper licenses as required under the state laws governing their respective trades. General Contractors are notified that Chapter 87 of the General Statutes of North Carolina, as applicable, will be observed in receiving and awarding general contracts. Contractor will be required to provide proof of applicable licensure.SITE VISITA site visit is highly recommended prior to submitting a bid for the work. A site visit will be held onOctober 27, 2025, at 10:00 AM, 235 Grey Water Road, Supply, NC 28462. If needed, please contact Mario Barron at emailFor security reasons, you must enable JavaScript to view this E-mail address.for alternative date or time.QUESTIONS/ADDENDAQuestions or requests for further information regarding this Invitation to Bid shall be submitted in writing toFor security reasons, you must enable JavaScript to view this E-mail address.no later than3:30 PM onNovember 3, 2025. A copy of all questions, further clarifications and answers will be made in the form of an Addendum to this Invitation to Bid and will be provided to all known bidders and posted on the County’s website. Notwithstanding the foregoing, bidders will be responsible for ensuring that they have all addenda.Bidders are expressly prohibited from contacting any Brunswick County official oremployee regarding this Invitation to Bid, except in the manner noted in this section.A violation of this provision is grounds for the immediate disqualification of thebidder.SCHEDULEThe work shall begin within ten (10) days of the issuance of Notice to Proceed by Brunswick County and shall be completed within sixty (60) days of issuance of the Notice to Proceed. There may be limitations on when the work may be performed based on the operational needs of the facility. Contractor shall provide a detailed proposed schedule with its submitted bid.BID DEADLINE AND SUBMITTAL REQUIREMENTSBids must be received no later than November 18, 2025, at 4:30 pm ET. BrunswickCounty will not be responsible for the failure of any mail or delivery service to delivera bid prior to the stated date and time. Incomplete Bids or bids inconsistent with therequired format shall be disqualified from consideration.Those interested should submit one (1) hard copy or one (1) electronic copy of the bid.Bids may be mailed, hand delivered, or emailed to the following:Mail:Mario BarronP.O. Box 249Bolivia, NC 28422Hand Delivery:Mario Barron250 Grey Water RoadSupply, NC 28462Email:For security reasons, you must enable JavaScript to view this E-mail address.

Key Requirements

RFP Submission Requirements for Bolivia TWAS to ATAD Drill

Contact Information

What you’ll get when you unlock

All the details after a short form. No spam

  • Latest RFP PDF
  • Buyer contact sheet
  • Submission checklist
  • Any addenda links

Fill in your details we'll send you your RFP

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.