Airport Taxiway B Decoupling (RFP)
Akron, City of - Utilities Business Office Division
Akron Utilities Business Office is seeking taxiway decoupling services for runway safety and pavement restoration.
Reference No.
RFP-2025-3128
Category
Infrastructure/Construction
Due Date
February 18th, 2026
Description
Project is for the decoupling of taxiway b south of the runway 7 end. The project includes full depth pavement removal, restoration of turf grades, and replacing a runway light within the removal limits. Work also includes 5,800 SY full depth asphalt pavement removal (+/-2"); 5,800 SY full depth concrete pavement removal (+/-7"); 1,500 CY embankment-in-place; 450 LF no. 8 awg, 5kv, l-824, type c cable, installed in trench, duct bank or conduit; 375 LF non-encased, electrical PVC conduit, 1-way 2-inch PVC; 1 EA medium intensity, elevated base mounted, led runway edge light; 9,900 SY seeding, wet applied.
This solicitation has some or all Local funding, additional requirements may apply. This project has a "prevailing wage" requirement. Questions Due Date Feb 11th 2026, 11:00 AM EST. If a bidder desires to visit the site in addition to the pre-bid meeting, he or she must contact Tony Plucinski of Summit Airport Services (330-733-4760) or tonyp@summitairportservices.com to schedule an appointment.
Key Requirements
RFP Submission Requirements for Akron Utilities Taxiway B
Contact Information
What you’ll get when you unlock
All the details after a short form. No spam
- Latest RFP PDF
- Buyer contact sheet
- Submission checklist
- Any addenda links