Bridge Replacement (Grading, Drainage, Pavement, and Bridge Removal)
Alabama Dept. of Transportation (DOT)
Alabama DOT is seeking a contractor for bridge replacement including grading, drainage, pavement, and bridge removal.
Reference No.
RFP-2025-3128
Category
Infrastructure/Construction
Due Date
September 26th, 2025
Description
Work includes clearing and grubbing approx 7 acres, 1 LS removal of old bridge, station 28+51. 180, 22 LF removing pipe, 150 LF removing guardrail, 528 LF removing fence, 2 EA removing headwalls, 8 EA removing guardrail end anchor (all type), 3,564 CY unclassified excavation, 24,354 CY borrow excavation (a4 or better), 11,777 Ton borrow excavation (underwater embankment), 887 CY unclassified bridge excavation, cofferdams or sheeting and shoring, station 78+86.000, 1,124 Ton roadbed stabilizing material, 16,007 SY geosynthetic reinforcement for soft soil stabilization, type 3. See attached file.
DBE Goal Percent 1.00.
This solicitation has some or all Federal funding, additional requirements may apply.
Key Requirements
RFP Submission Requirements for Alabama DOT Bridge Replacement
Contact Information
What you’ll get when you unlock
All the details after a short form. No spam
- Latest RFP PDF
- Buyer contact sheet
- Submission checklist
- Any addenda links