2025-IFB-304-Bear Creek Water Treatment Plant Sedimentation Basins Number 7 and 8 Plate Settlers
Douglasville-Douglas County Water & Sewer Authority
Douglasville-Douglas County Water & Sewer Authority is seeking plate settlers and trac vacs for water treatment plant sedimentation basins.
Reference No.
RFP-2025-3128
Category
Infrastructure/Construction
Due Date
November 5th, 2025
Description
INVITATION FOR BIDS DOUGLASVILLE-DOUGLAS COUNTY WATER AND SEWER AUTHORITY BEAR CREEK WATER TREATMENT PLANT SEDIMENTATION BASINS NUMBER 7 AND 8 PLATE SETTLERS AND TRAC VACS IFB #304 Sealed Bids will be received by the Authority at its Administrative Offices located at 8763 Hospital Drive, Douglasville, Georgia 30134 until the date and time listed below for the project titled BEAR CREEK WATER TREATMENT PLANT SEDIMENTATION BASINS NUMBER 7 AND 8 PLATE SETTLERS AND TRAC VACS, IFB #304. Bids shall be sealed and mailed or delivered to the Authority so that they are received no later than the date and time listed below. Bids received after this time will not be accepted. Bids shall be received by __2:00 PM, local time, on Wednesday, November 5, 2025. A non-mandatory pre-bid conference will be held at the Authority¿s Administrative Offices located at 8763 Hospital Drive, Douglasville, Georgia 30134 at_10:00 AM, local time, on Wednesday, October 22, 2025. Contractor shall hold a Utility Contractors License. The appropriate State of Georgia Utility Contractors License Number should appear on the face of the sealed bid envelope. Sealed bids will be accepted at the Authority prior to the bid opening, but no bid may be withdrawn after scheduled closing time for the period of at least 60 days, except as allowed by state law. The work to be accomplished consists of furnishing all materials, equipment, personnel, plus perform all the necessary labor to construct a complete and functioning project as follows: The Contractor shall remove and dispose of off-site the existing Tube Settlers and related items in Sedimentation Basins #7 and #8 and install the Authority-purchased Plate Settlers and related items, modify existing Trac Vac Header, install new Trac Vac cable drive, platforms, and electric cable drive units, and remove existing air operated Trac Vac sludge valve and replace with new Butterfly Valves with electric operators. Contractor shall remove only one Sedimentation Basin
Key Requirements
RFP Submission Requirements for DDWSA Plate Settlers
Contact Information
What you’ll get when you unlock
All the details after a short form. No spam
- Latest RFP PDF
- Buyer contact sheet
- Submission checklist
- Any addenda links