West Hill Rd Bridge 43 Deck Replacement
Town of Townshend
Town of Townshend is seeking bridge deck replacement for West Hill Rd Bridge 43 due to structural deficiency
Reference No.
RFP-2025-3128
Category
Infrastructure/Construction
Due Date
December 9th, 2025
Description
Replacement of the bridge deck, superstructure, bridge rail and bridge approach railing, and adding riprap for scour protection around the abutments of B43 on West Hill Road. The existing structure is 65' long. Construction will be in accordance with the design plans available upon request. The town is requiring the beams to be hot-dip galvanized steel beams
Key Requirements
RFP Submission Requirements for Townshend West Hill Bridge
Contact Information
What you’ll get when you unlock
All the details after a short form. No spam
- Latest RFP PDF
- Buyer contact sheet
- Submission checklist
- Any addenda links