60MW R.I.C.E. Generation Facility
Dalton Utilities
Dalton Utilities is seeking engineering and architectural services for a 60MW power generation facility design.
Reference No.
RFP-2025-3128
Category
Environment/Energy
Due Date
February 2nd, 2026
Description
Seeking engineering and architectural services to design a new power generation facility. The new facility will be designed and constructed to support full generation capacity of 6x20MW generators, whereas the initial capacity will be 3x20MW generators. The generators will be paralleled within an arc-resistant metal-clad switchgear lineup which will interconnect with a new substation for exporting. Provide a Building Information Model (BIM) in industry standard format, for all systems being installed within the facility. This should include all electrical systems (to include conduits 0.75" and larger), piping, ductwork, and other systems required to be installed within the new building.
This solicitation has some or all Local funding, additional requirements may apply.
Key Requirements
RFP Submission Requirements for Dalton Utilities 60MW R.I.C.E. Facility
Contact Information
What you’ll get when you unlock
All the details after a short form. No spam
- Latest RFP PDF
- Buyer contact sheet
- Submission checklist
- Any addenda links