RFPs
Carlsbad, City of
El Camino Real Widening from Poinsettia Lane to Camino Vida Roble

El Camino Real Widening from Poinsettia Lane to Camino Vida Roble

Carlsbad, City of

Carlsbad is seeking road widening construction services, including asphalt, concrete, and excavation, for El Camino Real improvements.

Reference No.
RFP-2025-3128
Category
Infrastructure/Construction
Due Date
October 22nd, 2025

Description

Work includes 829 ton asphalt concrete; 11,088 SF, colored stamped concrete; 1,297 CY, aggregate base; 47,900 SY, slurry seal; 4,392 CY, unclassified excavation; 95 CY, concrete sidewalk; 960 LF, concrete curb and gutter; 1,418 LF, temporary high-visibility fence; 166 LF, 18" RCP (1350-D); 4 LF, 24" RCP (1350-D); 390 LF, 8" PVC (perforated); 4 LF, 8" PVC (non-perforated); 1 LS, striping and markings; 1 LS, striping removal; 2 EA, relocate water meter; 1 LS, lighting system; 1 LS, traffic signal; 1 LS, irrigation; 1 LS, planting. See attached file. The cutoff date and time to submit questions or substitution request regarding this Project via Online Q&A in the online bidding portal is October 10, 2025, at 5 p.m. Contact Graham Jordan, 442-339-2462, graham.jordan@carlsbadca.gov. This solicitation has some or all Federal funding, additional requirements may apply. This project has a "prevailing wage" requirement. DBE Goal 22%.

Key Requirements

RFP Submission Requirements for Carlsbad El Camino Real Widening

Contact Information

What you’ll get when you unlock

All the details after a short form. No spam

  • Latest RFP PDF
  • Buyer contact sheet
  • Submission checklist
  • Any addenda links

Fill in your details we'll send you your RFP

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.