RFPs
Wausau
Facility Condition Assessment & Feasibility Study for the Wausau Area Transit System Wausau, Wisconsin

Facility Condition Assessment & Feasibility Study for the Wausau Area Transit System Wausau, Wisconsin

Wausau

Wausau is seeking a facility assessment and feasibility study to determine how to modernize their transit garage for electric buses.

Reference No.
RFP-2025-3128
Category
Facilities/Maintenance
Due Date
January 5th, 2026

Description

The City of Wausau and The Wausau Area Transit System (WATS), d.b.a. Metro Ride, are requesting proposals to complete a site condition assessment and feasibility study to assess whether the existing transit garage at 420 Plumer Street can support future needs of Metro Ride and be modernized to support a battery-electric fleet. The current facility serves 25 full sized buses, 5 paratransit buses, and space for all Metro Ride office and administrative staff. Modernization of the existing facility needs to be analyzed for cost against investment in constructing a new facility. The project consists of an analysis of the existing facility, a survey of alternate sites and consideration of environmental and other practical factors, such as the availability of electrical infrastructure at each location.RFPAppendix A of Procurement - Pricing ProposalAppendix I - Federal Clauses for Federal ContractsSubmit one electronic proposal copy through email toRon Schuenke, Wausau Metro Ride Transit Director -Ronald.Schuenke@wausauwi.gov, by January 5, 2026 at 4 PM CT.

Key Requirements

RFP Submission Requirements for Wausau Transit Assessment

Contact Information

What you’ll get when you unlock

All the details after a short form. No spam

  • Latest RFP PDF
  • Buyer contact sheet
  • Submission checklist
  • Any addenda links

Fill in your details we'll send you your RFP

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.