I-880 Integrated Corridor Management - Central Segment, Federal Project #CML 5041 (051), #2023.5620
San Leandro
San Leandro is seeking adaptive traffic signal control technology for corridor management improvements.
Reference No.
RFP-2025-3128
Category
Transportation/Logistics
Due Date
February 5th, 2026
Description
The City of San Leandro is seeking bids for the I-880 INTEGRATED CORRIDOR MANAGEMENT – CENTRAL SEGMENT, Federal Project No. CML 5041 (051), Project No. 2023.5620. The work to be done consists of deploying the CUBIC|Trafficware SynchroGreen Adaptive Signal Control (ASC) technology at fourteen (14) intersections along San Leandro Boulevard and Washington Avenue in San Leandro, CA. The traffic signal modification improvements to deploy SynchroGreen include controller upgrades, detection system upgrades, installation of battery backup systems, installation of fiber optic cable communication system; and doing all appurtenant work in place and ready for use, all as shown on the plans and described in the specifications.Bid 25-26-007 I-880 Integrated Corridor Management Addendum #1 -Posted January 26, 2026Bid 25-26007 I-880 Integrated Corridor Management Revised Specifications (Including Corrected Cover Sheet, per Addendum)-Posted January 26, 2026Bid 25-26.007 I-880 Integrated Corridor Management Central Segment Notice to BiddersPRE-BID CONFERENCE: A mandatory pre-bid video conference will be held on Tuesday, January 20, 2026, at 2:00 PM and on Wednesday, January 21, 2026, at 9:00 AM as follows:Tuesday, January 20, 2026, at 2:00 PMZoom Meeting ID: 845 7900 8873Passcode: 068262Zoom Link:https://sanleandro-org.zoom.us/j/84579008873?pwd=1ZdfDqNSb4G5bdDRNmt9NK377hwkiQ.1AndWednesday, January 21, 2026, at 9:00 AMZoom Meeting ID: 893 4914 2658Passcode: 742396Zoom Link:https://sanleandro-org.zoom.us/j/89349142658?pwd=7vaPX7ob34brFtmpezN2VqnKwlb9aW.1The information presented at the conferences will be identical, all bidders must attend one of the pre-bid conferences and sign the attendance sheet. A firm that didn’t attend the pre-bid conference isn’t qualified to bid on the project.
Key Requirements
RFP Submission Requirements for San Leandro I-880 ICM
Contact Information
What you’ll get when you unlock
All the details after a short form. No spam
- Latest RFP PDF
- Buyer contact sheet
- Submission checklist
- Any addenda links