Cherry Valley Dam Spillway Short-Term Improvement and Eleanor Dam Bridge Interim Repair - AFB
San Francisco City & County Public Utilities Commission
San Francisco Public Utilities Commission is seeking dam spillway and bridge repairs to extend the bridge's service life and re-establish flow.
Reference No.
RFP-2025-3128
Category
Infrastructure/Construction
Due Date
December 11th, 2025
Description
Re-establish the flow path through the original spillway channel of the Dam spillway and to replace the bridge deck of the Dam Bridge, to extend the service life of the bridge until permanent improvements can be made; excavation and removal of landslide debris from Dam spillway discharge channel side embankment and bank erosion protection to re-establish original discharge channel flow path; replacement of existing damaged 1” to 2” – thick concrete overlay atop the Dam Bridge deck with new composite polyester polymer concrete as well as patch repair crack and voids in the bridge deck, girders and soffit.
10% LBE. Pre-Bid Conference was held on 11/12/2025 at 10:00 AM. This project has a "prevailing wage" requirement.
This solicitation has some or all Local funding, additional requirements may apply.
Key Requirements
RFP Submission Requirements for SFPUC Dam Repairs
Contact Information
What you’ll get when you unlock
All the details after a short form. No spam
- Latest RFP PDF
- Buyer contact sheet
- Submission checklist
- Any addenda links