BR-0013(614) - Bridge Replacement (Grading, Drainage, Pavement, and Bridge Removal) on SR-13 (US-43) over Cold Creek north of Creola. Length 0.795 mi.
Alabama Dept. of Transportation (DOT)
Alabama DOT is seeking bridge replacement services for improved infrastructure on SR-13 over Cold Creek
Reference No.
RFP-2025-3128
Category
Infrastructure/Construction
Due Date
December 5th, 2025
Description
Work includes approx. 1 LS clearing & grubbing, 5,651 CY unclassified excavation, 11,596 SY bituminous treatment A, 2,741 Gal tack coat, 22,669 SY planing existing pavement, 476 SY reinforced concrete bridge end slab, 4,420 LB structural steel, 504 LF 24" RC roadway pipe, 921 LF cleaning existing pipe, 925 LF steel beam guardrail, 3 A seeding 7 AC mowing, erosion control, 3 AC pest control, signage, pavement marking.
This solicitation has some or all Federal funding, additional requirements may apply.
Key Requirements
RFP Submission Requirements for ALDOT SR-13 Bridge Replacement
Contact Information
What you’ll get when you unlock
All the details after a short form. No spam
- Latest RFP PDF
- Buyer contact sheet
- Submission checklist
- Any addenda links