Construction of the Realignment of White Sulphur Road - Phase II
Hall County
Hall County is seeking road construction services for the realignment of White Sulphur Road Phase II
Reference No.
RFP-2025-3128
Category
Infrastructure/Construction
Due Date
November 20th, 2025
Description
Work includes approx. 1 LS grading complete, 2,772 SY milling asphalt concrete pavement, 741 SY 4" concrete sidewalk, 1,220 LF 18" pavement reinforced fabric strips, 84 LF retaining wall, 2 EA changeable message sign, 101 TN recycled asphalt concrete patching, 2,881 LF 18" storm drain pipe, 4 EA manhole, 1,832 TN mulch, 5 TN fertilizer mixed grade, 147 LF highway signs, 4 EA thermoplastic pavement marking, 150 LF directional bore, 4 EA 6" gate valve, 65 LF 24" steel casing, 30 LF 6" water main, 3 EA fire hydrant, 3 EA relocate existing water meter and backflow preventer.
This solicitation has some or all Local funding, additional requirements may apply. Question writing due by November 4th, 2025. All communications must be directed solely to Andy Youngblood, Issuing Officer, at andrew.youngblood@hallcounty.org for questions or clarifications.
Key Requirements
RFP Submission Requirements for Hall County White Sulphur Road
Contact Information
What you’ll get when you unlock
All the details after a short form. No spam
- Latest RFP PDF
- Buyer contact sheet
- Submission checklist
- Any addenda links