2023-33 BRIDGE PREVENTATIVE MAINTENANCE PROGRAM PLAN
La Quinta
La Quinta is seeking engineering consultant services for bridge preventative maintenance program plans.
Reference No.
RFP-2025-3128
Category
Infrastructure/Construction
Due Date
September 15th, 2025
Description
The City of La Quinta seeks proposals from qualified Professional Engineering Consultants to prepare the plans, specifications, and engineer's estimate (PS&E) for Bridge Preventative Maintenance Program Plan, Federal Project No. BPMP-5433 (022), City Project No. 2023-33. Interested firms shall address in their qualification statements their ability to provide the following services if selected by the City. The successful firm will be expected to prepare the Plans, Specifications, and Engineer's Estimate (PS&E) to implement the maintenance improvements for five (5) of the City's eight (8) bridges. These improvements include deck spall repairs using rapid setting concrete, bridge deck sealing with high molecular weight methacrylate, joint seal replacements at abutments and piers, removal of cracked abutment backwalls and placement of polyester concrete expansion dams, slope protection improvements to meet CVWD standards, bent cap concrete repairs, bearing pad replacements, AC overlay removal and replacement with polyester concrete overlay, and paving notch repairs with rapid setting concrete. Working on state and federally funded projects requires in-depth knowledge of the Caltrans Local Assistance Procedures Manual (LAPM), Local Assistance Program Guidelines (LAPG), the Highway Bridge Program (HBP), and other Federal Highway Administration (FHWA) requirements. Click here for full RFP. Addendum no. 1 Revised timeline:
Key Requirements
RFP Submission Requirements for La Quinta Bridge Maintenance
Contact Information
What you’ll get when you unlock
All the details after a short form. No spam
- Latest RFP PDF
- Buyer contact sheet
- Submission checklist
- Any addenda links