Backup generator for municipal well
Eastman, City Of
Eastman is seeking a backup generator and transfer switch for emergency power at a municipal well.
Reference No.
RFP-2025-3128
Category
Environment/Energy
Due Date
February 20th, 2026
Description
The City of Eastman is seeking quotes for a generator to use as back-up power for the 150 HP motor that pumps water for one of its water wells. Eastman is seeking a 350 KW generator, 277/480 volt, three phase, 60 HZ, along with all required features and accessories and warranty. A 400-amp automatic transfer switch will be needed as well. Other work to be expected would be delivery and off-loading of equipment, installation and testing, along with all necessary wiring, concrete pad, etc
Key Requirements
RFP Submission Requirements for Eastman Backup Generator
Contact Information
What you’ll get when you unlock
All the details after a short form. No spam
- Latest RFP PDF
- Buyer contact sheet
- Submission checklist
- Any addenda links