Drainage Restoration, ADA Curb Ramps & Complete Street
California Dept. of Transportation - Caltrans
California DOT is seeking drainage restoration, ADA curb ramps, and complete street construction for infrastructure upgrades
Reference No.
RFP-2025-3128
Category
Infrastructure/Construction
Due Date
December 2nd, 2025
Description
Work consists of drainage restoration, ADA curb ramps & complete street, includes, 19,000 LF of temporary traffic stripe (paint); 910 LF of temporary check dam; 350 LF of remove yellow thermoplastic traffic stripe (hazardous waste); 780 SF of remove yellow thermoplastic pavement marking (hazardous waste); 1,500 LF of temporary arroyo toad fence; 3,200 LF of temporary protection fence (rope); 2,120 CY of roadway excavation; 4,020 TON of hot mix asphalt (type a); 2,630 TON of rubberized hot mix asphalt (gap graded); 4,000 LF of place hot mix asphalt dike (type d); 27,000 SY of cold plane asphalt concrete pavement; 450 LF of 18" reinforced concrete pipe; 90 LF of 30" reinforced concrete pipe trenchless installation method; 820 LF of cleaning, inspecting, and preparing culvert; 260 SF of furnish single sheet aluminum sign; 3,700 SF of thermoplastic pavement marking; 32,600 LF of 6" thermoplastic traffic stripe; 2,250 SF of remove thermoplastic pavement marking. See attached files.
This solicitation has some or all Federal funding, additional requirements may apply.
Key Requirements
RFP Submission Requirements for Caltrans Drainage, ADA, Streets