10/14/2025 at 2PM
Austin
Austin is seeking a contractor to construct a 72-inch diameter wastewater interceptor tunnel for flow diversion and system upgrades.
Reference No.
RFP-2025-3128
Category
Infrastructure/Construction
Due Date
October 14th, 2025
Description
This project will construct approximately 18,000 linear feet of new 72-inch diameter gravity interceptor tunneled along Williamson Creek. Flow will be diverted from the existing interceptor into the new interceptor to abandon as much of the existing interceptor as possible. The project also includes up to 22 cutover lines that will replace the existing interceptor connections and divert the localized flows to the new interceptor.
Key Requirements
RFP Submission Requirements for Austin 10/14/2025
Contact Information