018-62W62 - Replacement of Existing Span Wire Mounted Traffic Signals With New Mast Arm Mounted Traffic Signals
Illinois Dept. of Transportation - District 1
Illinois DOT is seeking traffic signal replacement for upgrading span wire signals to mast arm mounted signals.
Reference No.
RFP-2025-3128
Category
Infrastructure/Construction
Due Date
September 19th, 2025
Description
This work includes approx 316 LF of Temporary fence; 1,931 LF of 4" Underground conduit, galvanized steel; 7 EA of Maintenance of existing traffic signal installation; 1 EA of Transceiver - fiber optic; 7,130 LF of Electric cable in conduit, signal no. 14 5c; 12 EA of 16 FT Traffic signal post; 4 EA of Pedestrian signal head, led, 1-face, bracket mounted with countdown timer; 1,005 FT of Emergency vehicle priority system line sensor cable, no. 20 3/c; 1 EA of 10 FT Pedestrian signal post; 5,556 FT of Fiber optic cable 24 fibers, single mode; 2 EA of Video vehicle detection system, single approach. see outide link.
This solicitation has some or all Federal funding, additional requirements may apply. Questions not accepted as of September 09, 2025 04:30 PM. This project has a "prevailing wage" requirement. DBE Goal is 5%. Project Counties Cook, DuPagea and Will. This project is located at the following intersections 111th st and oketo ave Cook, 135th st and central ave Cook, IL RTE 83 (Glenwood Dyer rd) and Burnham ave cook, IL RTE 113 (coal city rd) and i-55 sb ramps will, il RTE 38 (Roosevelt rd) and Nicoll way Dupage. Project Engineer Iowan Plascencia - 847-705-4504.
Key Requirements
RFP Submission Requirements for Illinois DOT Traffic Signals
Contact Information
What you’ll get when you unlock
All the details after a short form. No spam
- Latest RFP PDF
- Buyer contact sheet
- Submission checklist
- Any addenda links