Dollar Rent-A-Car Building Demolition and Paving
Birmingham Airport Authority
Birmingham Airport Authority is seeking demolition and paving services for building removal and site preparation.
Reference No.
RFP-2025-3128
Category
Infrastructure/Construction
Due Date
October 10th, 2025
Description
Work shall include the complete demolition and removal of the former building. The building is located on a paved parcel, outside of the airfield but adjacent to Taxiway B and Runway 18-36. The structure is a single-story, metal-framed building with an approx. footprint of 3,400 SF, consisting of three primary areas A front office and customer service area, including two offices and storage areas. A service garage (repair bay) used for oil changes with a floor mounted hydraulic lift with overhead doors. A car wash bay at the rear with a floor-mounted wash rack.
Deadline for all questions October 3, 2025.
This solicitation has some or all Local funding, additional requirements may apply. This project has a "prevailing wage" requirement.
Key Requirements
RFP Submission Requirements for Birmingham Airport Authority Demolition
Contact Information
What you’ll get when you unlock
All the details after a short form. No spam
- Latest RFP PDF
- Buyer contact sheet
- Submission checklist
- Any addenda links