RFPs
Pensacola Beach
26-001 Port of Pensacola Paving and Rail Rehabilitation Project

26-001 Port of Pensacola Paving and Rail Rehabilitation Project

Pensacola Beach

Pensacola Beach is seeking paving and rail rehabilitation for port infrastructure improvements funded by disaster recovery grants.

Reference No.
RFP-2025-3128
Category
Infrastructure/Construction
Due Date
December 3rd, 2025

Description

SCOPE OF WORKThe Scope of Work for the Port of Pensacola Paving & Rail Rehabilitation Project, which is federally funded through the Community Development Block Grant – Disaster Recovery Funds (CDBG-DR) and the Florida Department of Transportation Florida Seaport Transportation and Economic Development Funds (FSTED), consists of the following tasks:The removal, disposal and replacement of the existing on-Port railroad track systems as shown on the drawings and specified.The removal and disposal or abandonment and grout fill of the existing underground potable water system for the entire Port property as shown on the drawings and specified.Furnish and install new potable and firewater system as shown on the drawings and specified.The removal and disposal of the existing backflow preventer located on the east side of Barracks Street approximately 300 feet south of Main Street.Furnish and install new backflow preventer on the east side of Barracks Street, inside the port security fence, east of the port security gate.The removal and disposal of portions of the existing stormwater collection system and the furnishing and installation of new stormwater collections systems as shown on the drawings and specified.The removal, disposal and replacement of the existing ships water concrete bunkers at Berths 2, 3 & 5 as shown on the drawings and specified.Repairs to existing dock structure expansion joints as shown on the drawings and specified.The removal and disposal of existing asphalt pavement and base material as shown on the drawings and specified.Grading and compaction of existing subgrade and furnish and install new asphalt and concrete pavement and base material as shown on the drawings and specified.Remove and dispose of existing cables and furnish and install new cathodic protection cables from the existing Berth 2 landside rectifier inside Warehouse 5 to the existing manhole near the landside of the Berth 2 bulkhead.  Splice new cables to existing cables inside the manholes and shown on the drawings and specified.Miscellaneous demolition and disposal as shown on the drawings and specified.All other work as shown on the drawings and specified.

Key Requirements

RFP Submission Requirements for Pensacola Beach Paving/Rail

Contact Information

What you’ll get when you unlock

All the details after a short form. No spam

  • Latest RFP PDF
  • Buyer contact sheet
  • Submission checklist
  • Any addenda links

Fill in your details we'll send you your RFP

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.