Bill Riley Trail Bridge Replacement – Design Services
Des Moines Water Works
Des Moines Water Works is seeking bridge design services for the Bill Riley Trail pedestrian bridge replacement project.
Reference No.
RFP-2025-3128
Category
Infrastructure/Construction
Due Date
February 3rd, 2026
Description
Requesting proposals from qualified consulting engineering firms licensed in the state of iowa to provide professional design services for the bill riley trail bridge replacement project. The project includes the replacement of the existing pedestrian bridge over the raccoon river in water works park. The scope includes a conceptual design evaluation phase followed by permitting, design, and preparation of plans and specifications.
This solicitation has some or all Local funding, additional requirements may apply.
Proposers are encouraged to visit the site and discuss the project with the DMWW staff; however, DMWW asks that appointments be made in advance for such visits.
Key Requirements
RFP Submission Requirements for Des Moines Water Works Bill Riley Bridge
Contact Information
What you’ll get when you unlock
All the details after a short form. No spam
- Latest RFP PDF
- Buyer contact sheet
- Submission checklist
- Any addenda links