Electrical Improvements Phase 4 At Tenth Avenue Marine Terminal
San Diego Unified Port District (Port of San Diego)
San Diego Unified Port District is seeking electrical improvements for terminal operations, EV charging, and harbor craft shore power.
Reference No.
RFP-2025-3128
Category
Infrastructure/Construction
Due Date
December 17th, 2025
Description
Construct new and replacement electrical infrastructure that supports terminal operations, electric vehicle charging, and harbor craft shore power systems. Base Bid A includes construction of new 15 kV medium-voltage infrastructure consisting of switchgear, transformers, switchboards, pad-mounted switches, panelboards, duct banks, conduits, manholes, pull boxes, grounding systems, and all associated civil, paving, and restoration work. The work also includes installation of Electric Vehicle Supply Equipment (EVSE), comprising six charging towers and twelve dispensers, performed exclusively by EVITP-certified electricians. Additional work includes exterior lighting, telecommunications and fiber optic cabling, protective bollards, and field testing, startup, commissioning, and equipment training for Port personnel. Base Bid B includes construction of a new Harbor Craft Shore Power Outlet system consisting of a shore power vault, 480V switchboard, 15kV load interrupter switch, transformers, panelboards, conduit, cabling, grounding, fencing, and associated civil improvements. Work also includes integration with existing medium-voltage systems, testing, and commissioning in coordination with terminal operations. Additive Bid C includes Port Tenant “Jankovich” electrical upgrades, consisting of new switchboard and transformer installations, conduit and duct bank construction, grounding systems, protective fencing and bollards, electrical cut-overs, temporary generator power, and coordination with SDG&E for final energization.
This solicitation has some or all Local funding, additional requirements may apply. Q&A Deadline 11/25/2025 1:00 PM (PST). The SBE participation goal for this proposal/bid/quote is 8% (eight percent).
Key Requirements
RFP Submission Requirements for Port of San Diego Electrical Improvements
Contact Information
What you’ll get when you unlock
All the details after a short form. No spam
- Latest RFP PDF
- Buyer contact sheet
- Submission checklist
- Any addenda links