Culvert Rehabilitation, Drainage Repairs and Miscellaneous Work on I-87 and I-90 - D215045
New York State Thruway Authority
NYS Thruway Authority is seeking culvert rehabilitation and drainage repairs for highway maintenance on I-87 and I-90.
Reference No.
RFP-2025-3128
Category
Infrastructure/Construction
Due Date
January 28th, 2026
Description
Dispose of materials containing invasive species; Remove 42" CMP (20 '), inlet extension, headwall and one section of 48" RCP.nstall concrete collar and 12 LF of new 48" SICPP.Install new galv. end section with cutoff wall.Clean, grade, and shape existing roadside section.Clean and video inspect pipe lines.Cut and remove 36" CMP (8 ft.) plus galvanized metal end section.Install 36" new metal end section.Install stone lined ditch to drain to CIN 09137005. Grade slope to match existing, topsoil and establish turf. See attached files.
Work locations I-87 and I-90 Between MP 91.3± and MP 197.4±; and I-90 Between MP B3.7± and MP B21.5± in Ulster, Columbia, Rensselaer, Albany, Schenectady, and Montgomery Counties. MBE Goal 7.50%; WBE Goal 7.50%; SDVOB Goal 3.00%.
This solicitation has some or all Local funding, additional requirements may apply.This project has a "prevailing wage" requirement.
Key Requirements
RFP Submission Requirements for NY Thruway Culvert Rehab
Contact Information
What you’ll get when you unlock
All the details after a short form. No spam
- Latest RFP PDF
- Buyer contact sheet
- Submission checklist
- Any addenda links