Elgin Elementary School MEP Upgrades- Phase 3
Elgin ISD, TX
Elgin ISD is seeking HVAC upgrades for improved climate control and energy efficiency in school buildings.
Reference No.
RFP-2025-3128
Category
Infrastructure/Construction
Due Date
October 30th, 2025
Description
Pursuant to the provisions of the Texas Government Code, Chapter 2269, Subchapter D, the Elgin Independent School District intends to select, via Competitive Sealed Proposals, a Contractor for the Administration Building HVAC Replacement Project. The base bid of project includes but is not limited to the replacement of three split-system air handling units with new units featuring VRF heat pumps and coils. These units serve the cafeteria, southwest classroom wing, and library/admin spaces. The scope includes demolishing and replacing ductwork, installing new VAV boxes with electric reheat, and removing ceilings to facilitate ductwork installation. Some ceilings will be fully demolished and replaced, while others will be partially removed and reinstalled to match original conditions. An owner-furnished switchboard will be installed, and a nearby transformer will be relocated by the utility provider, with new power routing to the switchboard. Additionally, part of the outdoor brick wall will be demolished and replaced with fencing. Alternate 1: Replace one split-system air handling unit in the northeast classroom wing with a new unit featuring VRF heat pump and coil. Similar ductwork and ceiling modifications as the base bid will be performed. Alternate 2: Replace one split-system air handling unit in the southeast classroom wing, including demolition of associated ductwork and an existing hot water boiler. Ceiling modifications will be similar to other phases. Alternate 3: Replace eleven electrical panels campus-wide with new units. Alternate 4: Provide HVAC controls by ALC
Key Requirements
RFP Submission Requirements for Elgin ISD Elementary MEP Upgrades
Contact Information
What you’ll get when you unlock
All the details after a short form. No spam
- Latest RFP PDF
- Buyer contact sheet
- Submission checklist
- Any addenda links