Electric Bid - Pure Flavor Greenhouse Expansion Phase 2
Fort Valley Utility Commission
Fort Valley Utility Commission is seeking an electric primary feeder system for a greenhouse expansion.
Reference No.
RFP-2025-3128
Category
Infrastructure/Construction
Due Date
December 17th, 2025
Description
Construction of the electric primary feeder system for the pure flavor greenhouse expansion. This will be a 25KV primary system that will be a mixture of overhead primary lines and underground primary lines along with transformers and switch-gear (Scope of work and drawingsare included with this packet). Project Scope Consists of setting three Ductile Iron poles 50/H9 approx. 4,970 Lbs each. Install twenty-two, 45/2 wood poles. Install 6" Sch40 PVC combined length of approx. 2500 FT. Install approx. 2500 FT combined length of 1000mcm 3 phase primary cable. Install 24 1000mcm T-Bodies. Install 7 Gang operated RLB switches. Install 1 PME-10 Switch Cabinet. Install 18 1000mcm Terminators. Install 336 ACSR combined length of approx. 20,000 FT. Install 70 336 Perform top ties. Install approx. 3,000 FT combined length of 1/0 25kv cable. Install approx. 2,000 FT combined length of 4/0 25kv cable. Install 4 –25KV 3000KVA Transformers 277/480. Install 1000mcm feeder from substation to metering cubicle. Change out existing PME-10 to metering cubicles. Install two new metering cubicles on top of existing vault. Conduits will be Stubbed outside the substation fence by MEAG Power. The contractor will be responsible for maintaining the phasing of all tie points.
This solicitation has some or all Local funding, additional requirements may apply.
Key Requirements
RFP Submission Requirements for Fort Valley Utility Pure Flavor Bid
Contact Information
What you’ll get when you unlock
All the details after a short form. No spam
- Latest RFP PDF
- Buyer contact sheet
- Submission checklist
- Any addenda links