FY 2021 Onsite and Young's Farmland Non-Potable Water Pipeline Projects - Bid
Coachella Valley Water District, Engineering
Coachella Valley Water District Engineering is seeking non-potable water pipelines for onsite and Young's Farmland projects.
Reference No.
RFP-2025-3128
Category
Infrastructure/Construction
Due Date
October 22nd, 2025
Description
The Project consists of onsite non-potable water pipelines. The project consists of furnishing and installing approx. 14,450 LF of C900 PVC pipe and installing zinc coated ductile iron pipe with V-Bio Polyethylene encasement, including valves, fittings, restrained joints, all necessary appurtenances, and surface restoration. Additional facilities include Five (5) meter vaults with electromagnetic flow meters and electronic pressure regulating valves. Six (6) control valve vaults. Six (6) lake discharge structures, 10 LF of Furnish and install 18" steel casing, with minimum 0.25" wall thickness, by open cut method. 2 EA of Furnish and install 8" buried flanged plug valve, including, but not limited to, all necessary appurtenances, restrained fittings, and all related work, 4 EA of Furnish and install 2" combination air valve, including all fittings and appurtenances, 2,461 LF of Furnish and install 8" Class 350, ductile iron, zinc coated, CML, polyethylene encased, non-potable pipeline, including, but not limited to, trenching, backfilling, imported bedding and backfill, compaction, testing, fittings, restrained joints, and appurtenances (Stations 10+00.00 to 34+61).
Q&A Deadline 10/07/2025 5:00 PM (PDT).
This solicitation has some or all Local funding, additional requirements may apply.
Key Requirements
RFP Submission Requirements for CVWD Pipeline Projects
Contact Information
What you’ll get when you unlock
All the details after a short form. No spam
- Latest RFP PDF
- Buyer contact sheet
- Submission checklist
- Any addenda links