O Street Wastewater Pump Station Project (CIP WW 26-22)
Lathrop
Lathrop is seeking engineering firms for wastewater pump station replacement to increase capacity and improve efficiency.
Reference No.
RFP-2025-3128
Category
Infrastructure/Construction
Due Date
November 18th, 2025
Description
The City of Lathrop Department of Public Works is inviting qualified engineering firms to submit proposals for the O Street Wastewater Pump Station Project (CIP WW 26-22). This project involves replacing the existing wastewater pump station with a new facility designed to increase capacity and improve operational efficiency. The proposed project will replace the existing O Street Pump Station with a new facility to be constructed on a corner of the Lathrop Elementary School property, across the street from the current site. The new station will connect to the existing gravity and force mains along O Street. The project scope includes installation of two (2) 15-horsepower pumps equipped with variable frequency drives (VFDs) to accommodate Peak Wet Weather Flow (PWWF) and Total Dynamic Head (TDH) at ultimate buildout conditions. Additionally, one (1) 5-horsepower pump will be installed at the existing O Street Pump Station to support low-flow operations. The Request for Proposals (RFP) includes detailed information on project scope, submittal requirements, and the selection process. Interested firms are encouraged to review the RFP and submit their proposals byNovember 18, 2025 (by 5:00 PM).
Key Requirements
RFP Submission Requirements for Lathrop O Street Pump Station
Contact Information
What you’ll get when you unlock
All the details after a short form. No spam
- Latest RFP PDF
- Buyer contact sheet
- Submission checklist
- Any addenda links