RFPs
Capitol Area Development Authority (CADA)
Boiler System Replacement Project

Boiler System Replacement Project

Capitol Area Development Authority (CADA)

Capitol Area Development Authority is seeking boiler system replacement for facility upgrades

Reference No.
RFP-2025-3128
Category
Infrastructure/Construction
Due Date
November 20th, 2025

Description

Work includes demolition and disposal of existing boiler equipment, piping, and exhaust ducting; furnishing and installation of two (2) new cleaver-brooks vertical tubeless steam boilers with associated feedwater tank, pumps, blowdown separator, softener system, draft inducer, venting, and controls. This solicitation has some or all Local funding, additional requirements may apply. This project has a "prevailing wage" requirement. If any Contractor desires a modification or has any questions, you shall request, in writing, such modification or questions prior to 2:00 p.m. on Friday, November 14, 2025.

Key Requirements

RFP Submission Requirements for CADA Boiler Replacement

Contact Information

What you’ll get when you unlock

All the details after a short form. No spam

  • Latest RFP PDF
  • Buyer contact sheet
  • Submission checklist
  • Any addenda links

Fill in your details we'll send you your RFP

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.