RFPs
Alabama Dept. of Transportation (DOT)
BR-0002(579) - Bridge Replacement (Grading, Drainage, Pavement, Traffic Lighting, and Bridge) on SR-2 (US-72) over SR-20 in Florence. Length 0.518 mi.

BR-0002(579) - Bridge Replacement (Grading, Drainage, Pavement, Traffic Lighting, and Bridge) on SR-2 (US-72) over SR-20 in Florence. Length 0.518 mi.

Alabama Dept. of Transportation (DOT)

Alabama DOT is seeking a contractor for bridge replacement and related road work on SR-2 over SR-20 in Florence.

Reference No.
RFP-2025-3128
Category
Infrastructure/Construction
Due Date
December 5th, 2025

Description

Work includes approx. 1 LS clearing & grubbing, 6,678 CY unclassified excavation, 10,398 SY bituminous treatment A, 3,873 Gal tack coat, 25,015 SY micro-milling, 15,400 LB steel reinforcement, 372 SY reinforced cement concrete bridge end slab, 1,750 LF steel piling, 276 LF bridge barrier rail, 1,157 LF 18" RC roadway pipe, 33 LF 24" jacked installation road steel pipe, 1,150 LF steel beam guardrail, 111 LF concrete curb, sodding, erosion control, 5 AC pest control, pavement marking, signage, 10 EA roadway luminaire, 325 LF 6" electrical conduit. This solicitation has some or all Federal funding, additional requirements may apply.

Key Requirements

RFP Submission Requirements for Alabama DOT Bridge Replacement

Contact Information

What you’ll get when you unlock

All the details after a short form. No spam

  • Latest RFP PDF
  • Buyer contact sheet
  • Submission checklist
  • Any addenda links

Fill in your details we'll send you your RFP

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.