RFPs
Texas Facilities Commission
Construction Materials Testing for TJJD New Detention Facilities

Construction Materials Testing for TJJD New Detention Facilities

Texas Facilities Commission

Texas Facilities Commission is seeking construction material testing services for new juvenile detention facilities construction.

Reference No.
RFP-2025-3128
Category
Infrastructure/Construction
Due Date
September 2nd, 2025

Description

CLASS-ITEM DESCRIPTION 907-83 Testing Services 925-42 Foundation Engineering 925-44 General Construction: Management, Scheduling, Cost Estimation Engineering 925-55 Inspection, General Engineering 968-47 Inspection Services, Construction Type 992-34 Concrete Testing Services 992-36 Core Sample, not Concrete Testing Services 992-55 Miscellaneous Testing and Calibration Services SCOPE: In accordance with the provisions of TexasGovernment Code, Chapter 2254, Subchapter A, Professional Services, and Rulesand Procedures adopted by the Texas Facilities Commission (TFC), TFC isrequesting submittal of qualifications to provide construction material testing(CMT) services for Texas Juvenile Justice Department’s Project # 24-43-2558 toconstruct two new detention facilities; one in Ellis County and one in BrazoriaCounty. CONTRACTTERM: It isthe intention of TFC to award a Contract for full prime CMT and SpecialInspections services for the term of the project. Services undertaken pursuantto this RFQ will be required to commence within ten (10) calendar days ofdelivery of a Notice to Proceed. The Project associated with the servicesrequested in this solicitation is anticipated to be approximately thirty (30)months or substantial completion in Summer 2028. . STATEMENT OF WORK: This Statement of Work (SOW)outlines the comprehensive scope of services to be provided by the selectedConstruction Materials Testing (CMT) firm for the Juvenile Justice Centerproject on behalf of the Texas Facilities Commission (TFC). The purpose of thisengagement is to ensure that construction materials and workmanship comply withproject specifications, building codes, and applicable standards over theentire construction duration of thirty (30) months.1. Collaborationand Project Integration: The CMT firm shall serve as an independententity within the project team, working separately from the Architect/Engineer(A/E) and Construction Manager at Risk (CMR). The firm will collaborate closelywith TFC, A/E, CMR, Commissioning Agent (CxA), third-party testing firms, andtrade contractors throughout all phases of the project, as outlined in thegoverning contract. Active coordination will be required during constructionadministration to ensure alignment of inspections, testing, and quality assurancemeasures.2. Duration ofServices: The CMT firmshall provide all required testing, observation, and inspection servicescontinuously over a period of thirty (30) months, in accordance with the masterproject schedule, site conditions, and contractor sequencing.3. Scope ofServices: The scope ofservices shall be comprehensive in nature and shall include, but is not limitedto, the following areas of materials testing and inspection:A. Deep Foundation inspection and observationB. Structural SteelC. Concrete (includes reinforcing steel observation,post-tensioning steel observation, and observation for anchors cast inconcrete)D. Tendon Stressing RecordsE. Structural MasonryF. SoilsG. Sprayed Fire-Resistant MaterialsH. Fire-Resistant Penetrations and JointsI. Ultrasonic Testing ofChilled Water Pipe WeldsJ. Field Testing andInspections – Earthwork Observation and Field Density TestingK. On-site Concrete Observation/TestingL. Asphalt Observation/TestingM. Pre-Construction TestingN. Special Testing and Inspections: 1) High Strength Bolted and WeldedConnections 2) Inspection of ArchitecturallyExposed Structural Steel (AESS) in Place 3) Field Weld InspectionsO. Firestopping Field Testing (ASTM E2174)P. Infrared Thermography Inspections of BuildingEnvelope and Roof SystemsQ. ASTM Window Chamber TestingR. Water Penetration Testing (AAMA 501.2)S. Whole Building Air Barrier Leakage Testing (ASTME779)4. CoordinationRequirements: TheCMT firm shall actively coordinate with the Commissioning Agent (CxA), A/E, andCMR throughout the construction phase to ensure proper scheduling and timelyexecution of all required testing and inspections. The firm must maintain openlines of communication with the project team to adapt to construction progressand identify scheduling constraints or conflicts in real time.5. ReferenceDocumentation:Detailed requirements and testing procedures are further described in AttachmentG – Materials Testing Scope of Work Breakdown, which forms a criticalcomponent of this Statement of Work. The CMT firm shall comply fully with theprovisions outlined therein.6. ComplianceRequirements:All services rendered by the CMT firm must comply with the State of Texasnon-discrimination requirements and all applicable federal and stateregulations. Equal opportunity employment practices shall be maintainedthroughout the term of the contract. MANDATORY PRE-SUBMITTALTELECONFERENCES: The mandatorypre-submittal conferences will be held on Tuesday, August 19, 2025 at 10:00 AMand Wednesday, August 20, 2025 at 10:00 AM. Pre-registrationis required to participate in the teleconference. Respondents must have anemployee of their firm attend at least one (1) of the two (2) scheduled pre-submittal teleconferences. TFC shallreject submittals submittedby firms that did not attendone of the mandatory pre-submittal conferences. TFC is using the eProcurementsystem Bonfire. Respondents mustregister for a Bonfire account (No Charge) to submit a response. Respondents must submit theirresponses/submittals at the following link: https://tfcstate.bonfirehub.com/opportunities/197072 SCHEDULE OF EVENTS: TFC reserves theright to change the dates shown below. EVENT DATE Issue RFQ 8/05/2025 Mandatory Pre-Submittal Conference 8/19/2025 Tuesday, 10:00 AM (OR) Mandatory Pre-Submittal Conference 8/20/2025 Wednesday, 10:00 AM Deadline for Submission of Questions 8/26/2025 Deadline for Submission of Qualifications & HSP 9/02/2025 Tuesday @ 10:00 PM Notification to Interview 9/12/2025 If Interviews are NOT required by TFC Award 10/16/2025 Execute Contract 11/17/2025 If Interviews are required by TFC Interviews of short-listed firms 9/23/2025 Award 10/16/2025 Execute Contract 11/17/2025 This Request for Qualifications (RFQ) is posted on the ElectronicState Business Daily (ESBD) located on the Texas Comptroller of PublicAccounts’ web page located athttps://www.txsmartbuy.com/esbddetails/view/0006148 This website will have the most current information during thesolicitation

Key Requirements

RFP Submission Requirements for Texas Facilities Commission Materials Testing

Contact Information

What you’ll get when you unlock

All the details after a short form. No spam

  • Latest RFP PDF
  • Buyer contact sheet
  • Submission checklist
  • Any addenda links

Fill in your details we'll send you your RFP

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.