26-010 Barrancas Avenue Bioretention Project
Pensacola Beach
Pensacola Beach is seeking bioretention swale installation for stormwater treatment and flood mitigation along Barrancas Avenue.
Reference No.
RFP-2025-3128
Category
Infrastructure/Construction
Due Date
January 21st, 2026
Description
The Barrancas Avenue Right-of-Way has proven to be prone to flooding, and as a contributing basin to Bayou Chico, water treatment is necessary for the stormwater collected in this area. This project addresses the stormwater by channeling it off of the roadway and from the gutters into a series of bioretention treatment swales along the roadway, 5 in total of varying sizes.
Key Requirements
RFP Submission Requirements for Pensacola Beach Bioretention
Contact Information
What you’ll get when you unlock
All the details after a short form. No spam
- Latest RFP PDF
- Buyer contact sheet
- Submission checklist
- Any addenda links