DAF WTP Pump VFD Replacement
City of Waco
City of Waco is seeking proposals for daf wtp pump vfd replacement.
Reference No.
RFP-2025-3128
Category
Infrastructure/Construction
Due Date
October 13th, 2025
Description
The project generally consists of the replacement for the Dissolved Air Flotation Water Treatment Plant Pump No. 2 VFD furnishing of all labor, materials, equipment, appurtenances, and incidentals as shown, specified and required for demolition, removal, and disposal work required to properly install the equipment and ensure all instrument and control connections are correctly configured, follow the manufacturer’s installation guide, verify wiring according to the schematic, and perform functioning testing before commissioning the VFD. The project requires all site work, labor, equipment, and materials complete and in place as stated in the RFB, shown on the plans, and specified herein. General Contractor shall self-perform a minimum of 51% of this project. Liquidation Fee is $1000.00 for each day of delay
Key Requirements
RFP Submission Requirements for City of Waco Pump VFD Replacement
Contact Information
What you’ll get when you unlock
All the details after a short form. No spam
- Latest RFP PDF
- Buyer contact sheet
- Submission checklist
- Any addenda links