RFPs
Dolores School District RE-4A
Boiler Replacement Project - Commons Area Dolores School District 1 - (RFP)

Boiler Replacement Project - Commons Area Dolores School District 1 - (RFP)

Dolores School District RE-4A

Dolores School District is seeking a boiler replacement for the Commons area due to outdated equipment

Reference No.
RFP-2025-3128
Category
Infrastructure/Construction
Due Date
February 16th, 2026

Description

The scope of work shall include, but is not limited to, the following Demolition and Removal Disconnect, remove, and properly dispose of the existing Raypak boiler and associated components as required. Cap or modify existing piping and utilities as necessary during demolition. New Boiler System Installation Furnish and install new Lochinvar high‐efficiency, condensing, modulating boiler(s), properly sized for the existing heating load of the Commons area. Install all required piping, valves, pumps, expansion tanks, air separators, and accessories to ensure a complete, operational system. Provide new venting and combustion air systems compliant with manufacturer requirements and applicable codes. Integrate new boilers with the existing heating distribution system. Controls and Integration Provide and install boiler controls per Lochinvar manufacturer specifications. Coordinate integration with existing building automation or control systems (if applicable). Program and commission the boiler controls to ensure efficient operation and proper modulation. Electrical and Gas Provide all electrical connections, disconnects, and control wiring required for the new boiler system. Modify or install natural gas piping as required to support the new equipment. Testing, Commissioning, and Training Perform start‐up, testing, and commissioning of the new boiler system. Verify proper operation under various load conditions. Provide on‐site training for District maintenance staff covering operation, basic troubleshooting, and routine maintenance. Permits and Inspections Obtain all required permits. Coordinate and pass all required inspections. Equipment Requirements Boilers shall be Lochinvar high‐efficiency, condensing, modulating units with a minimum thermal efficiency of 90% or greater. Equipment must be new, current‐model, and UL-listed. Boilers shall include manufacturer warranties. This solicitation has some or all Local funding, additional requirements may apply. Questions Due February 6, 2026. All questions shall be directed to Dolores School District Facilities Department Attn Alfonso Goad agoad@dolores.k12.co.us.

Key Requirements

RFP Submission Requirements for Dolores Schools Boiler Replacement

Contact Information

What you’ll get when you unlock

All the details after a short form. No spam

  • Latest RFP PDF
  • Buyer contact sheet
  • Submission checklist
  • Any addenda links

Fill in your details we'll send you your RFP

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.